Three years ago, we were asked whether a lake could be dropped into this 6.5m deep quarry, that flooded with natural groundwater in the winter. “Sure”, we said and after a long, protracted planning application and about three months of muck-away lorries filling in, the hole was formed.
Liner supply shortages meant we had our first outing with Firestone’s GeoSmart membrane.
Reminiscent of our first baptism by fire, this lagoon certainly tested our Quality and skill for seaming! The forecast of rain and long daylight hours meant we beat the odds, getting it lined before biblical rainfall.
August, as planned, saw us return to plant over 1,200 plants around the circumference of the lake, leaving site lines or fishing spots appropriately.
A new 1 HP Kasco floating aerator fountain and 1/2 HP Kasco aerator were installed, along with a circulating pump fitted to the jetty to create a ‘swim’ for the trout when they arrive in November. Two days of absolute pleasure and a first outing of our friends’ drone.
We re-visited in December to find the lake looking wonderful.